High Construction Efficiency 3-Hold Dwt 8527t Bulk Carrier

Product Details
Customization: Available
After-sales Service: on Line Service
Warranty: 12 Months
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory, Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Multi-language Pioneer
2 languages freely used by foreign trade staff. include: English, Russian
Customization from Designs
The supplier provides design based customization services
Product Certification
The supplier's products already have relevant certification qualifications, including:
CE
to see all verified strength labels (17)
  • High Construction Efficiency 3-Hold Dwt 8527t Bulk Carrier
  • High Construction Efficiency 3-Hold Dwt 8527t Bulk Carrier
  • High Construction Efficiency 3-Hold Dwt 8527t Bulk Carrier
  • High Construction Efficiency 3-Hold Dwt 8527t Bulk Carrier
  • High Construction Efficiency 3-Hold Dwt 8527t Bulk Carrier
  • High Construction Efficiency 3-Hold Dwt 8527t Bulk Carrier
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Our Shipyard
  • After Sales Service
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
8527T
Customized
Customized
Certification
CCS
Max Pay Load
56675t
Load Capacity
>100CBM
Type
Marine Cargo Ship
Condition
Used
Length (M)
> 150m
Fuel Type
Diesel
Hull Material
Marine Steel
Loa
114m
Beam
18.2m
Depth
11m
Transport Package
Sea Worthy Standard Packing
Specification
8527T
Trademark
E-TOUCH
Origin
China

Packaging & Delivery

Package Size
11400.00cm * 1820.00cm * 1100.00cm
Package Gross Weight
3322000.000kg

Product Description

Product Description

High Construction Efficiency 3-Hold Dwt 8527t Bulk Carrier

 

A bulk carrier or bulker is a merchant ship specially designed to transport unpackaged bulk cargo-such as grain, coal, ore, steel coils, and cement-in its cargo holds. Since the first specialized bulk carrier was built in 1852, economic forces have led to increased size and sophistication of these ships. Today's bulk carriers are specially designed to maximize capacity, safety, efficiency, and durability.

Today, bulk carriers make up 21 percent of the world's merchant fleets,[2] and they range in size from single-hold mini-bulk carriers to mammoth ore ships able to carry 400,000 metric tons of deadweight (DWT). A number of specialized designs exist: some can unload their own cargo, some depend on port facilities for unloading, and some even package the cargo as it is loaded.

Product Parameters

High Construction Efficiency 3-Hold Dwt 8527t Bulk Carrier
 
Type Bulk carrier
LOA 114.00m
Beam 18.20m
Depth 11.00m
Draft 11.997m(LOAD) / 5.593m(UNLOAD)
DWT 67312.910T / 9576.690T
DWCC 8527T
Class PMDS
Year of Built 1990
Speed 11-12Kn
 

Main Engine Makita Mitsui B&W 8L35MC, Japan 6080Hp

Holds / 6 Hatches

Hatch Cover: Pontoon Type, Compression Bar and Cleats

 
Our Shipyard

High Construction Efficiency 3-Hold Dwt 8527t Bulk Carrier
High Construction Efficiency 3-Hold Dwt 8527t Bulk Carrier
High Construction Efficiency 3-Hold Dwt 8527t Bulk Carrier

After Sales Service

Spare parts:
*Support spare parts are in stock.
*We provides a convenient way for you to order parts. You can simply select the parts you need according to your specs and have them delivered directly to your site.
*Free spare part in the first year and later cost price and services.

Installation and commissioning:
*After delivery we send two experienced engineers who will be to guide installing and train local workers. 24/7 technical support standby. 
*We have offices and agents in some countries and are ready to provide you with solutions.

Maintenance and Support:
*12 months manufacturing warranty on all new installed component parts.
*12 months warranty on engine.
*12 months warranty on hull and all fabricated parts.
*In the event that our customers dredging experience unskilled or mechanical failure or they just need to shoot a minor problem, HICL engineers are available at customer's services, all dredger from HICL, there are always engineers for installation and training if customers needs. Before dredger ex-factory, it will be tested at our launching site for performance and safety like in the work place.

Training:
*E-TOUCH Services offers training and expertise that can help you make sure all of you personnel are operating as safely as possible.
*The products below will help you teach people at every level of your operation how to operate safely and how to communicate clearly, effectively and openly about any potential safety concerns.
*As technology continues to enhance our world, HICL is constantly developing and refining advanced technologies. These products, along with the extensive training curriculum offered, provide everything you need to maximize the performance of your equipment, reduce costly downtime, increase your return on investment, improve safety in your workplace, enhance operator performance, and much more.

Packaging & Shipping

High Construction Efficiency 3-Hold Dwt 8527t Bulk Carrier

FAQ

Dredger and Ship Building

1, Material Purchase
*Checking the Business License and Registration Certificate of Suppliers.

*Using calipers to test the thickness of steel plate.

*Using sclerometer to test the hardness of the steel plate.

2, Pontoons Welding
*Using welding failure detector to inspect the welding quality.

3, Equipment Assembling
*All the equipments on the dredger should be well-know brand including Cummins engine, Siemens PLC, Japan Yuken Hydraulic valve block.

*Using three dial gauges to adjust the concentricity of engine, gearbox and pump.

*All the electric lines are concealed wiring type.

*All the Hydraulic pipes are pickled three times.


4, Dredger Painting
*All E-TOUCH Dredger construction parts are of shot blasted plate with shop primer. Dredger after construction and assembly all rusty surfaces, welding spots and damaged shop primer will be cleaned and coated with primer.

*The painting of machine parts, readily supplied by third parties will be cleaned and touched -up in the original color. 

*Color scheme according to owner's specification.


5, No-load Test
* All the main equipment, including Engine, Gearbox, Pump, Hydraulic system.
* Electric system, are tested for at least 2 hours in factory.
*All the suppliers of the main parts should be on the spot to solve any problem.

6, Dismounting and Packing
*All the parts are marked before dismounting.
*All the small parts are put into packaging box with a packing list.
* All the hydraulic pumps and pipes joints are packed by plastic wrap.
*Every part ( no matter how small ) is registered on the packing list.

7, Delivery
* All the big parts are fixed in the containers by wires ,
* Before delivery, all the persons in charge should sign and make sure all the equipment are in good shape.

Dredger Launching Site is Available in our Shipyard
In order to guarantee good performance and safety of our cutter suction dredger, all our products will be tested at the launching site before ex-factory, it is tested like the machine working in the customer's working site. Performance and safety will be tested and recorded in the testing process. Usually, the buyer can also supervised the testing process before dismantle the dredge.

A. Preparing work before Dredger Testing
1) Customers will be invited to watch dredger test , radio and pictures will email to buyers.
2) Every parts and connections of dredger should be checked strictly before test.
3) Oil and cooling water should be ready for dredger test.

B. Dredger Test Contents
1). Work condition of electricity connection of dredger should be checked .
2). Emergency pump to check operation conditions of hydraulic controlling system,
3). The speed and power of diesel engine should be tested
4). Dredging pump will be tested and rotates at different speed with fresh water. 5). In order to check the operation of various hydraulic machinery and values, the main hydraulic pump will be opened and hydraulic system load performance should be tested.

C. After Testing
1). All equipment performances and testing recorded will be printed as report for customers' reference.
2). after testing, all work about dredger dismantle should be prepared and let customer knows when and what time will do the delivery.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now