Product Description
This ship is a deck cargo ship driven by stern engine, bulbous nose post, double engine and double propeller, double rudder and diesel engine. The ship has a first floor at the bow and four deckhouses at the stern, and is equipped with BRC Semi-automatic cabin. The middle area is a single-deck and single-bottom longitudinal framing structure, and the fore and aft areas are a single-deck and single-bottom transverse framing structure. This ship ships bulky and general dry general cargo and bulk cargo. Use the vehicle to disembark and disembark the vessel through the bow ramp when loading and unloading cargo. All cargo loading and unloading is completed, and when the ship is ready to sail, it should be ensured that all loading and unloading vehicles have safely left the ship through the ramp. During the voyage of the ship, no one loading and unloading vehicle is allowed to stay in the loading area. At the same time, the ramp should be raised with each side armor. The board room is sealed and locked, and corresponding sound and light alarm facilities are provided in the cab. The navigation area of this ship is the sea navigation area.BClass ice area strengthening.
Product Parameters
Year of Built |
2020 |
Vessel type |
Deck Cargo Ship |
LOA |
90.8 m |
Hull Length |
84.5 m |
Breadth |
20.8 m |
Depth |
4.98 m |
Light draft |
2.352 m |
Load draft |
3.800 m |
Light displacement |
3494.90 t |
Load displacement |
5934.00 t |
DWT |
4382 t |
Detailed Photos
After Sales Service
Spare parts:
*Support spare parts are in stock.
*We provides a convenient way for you to order parts. You can simply select the parts you need according to your specs and have them delivered directly to your site.
*Free spare part in the first year and later cost price and services.
Installation and commissioning:
*After delivery we send two experienced engineers who will be to guide installing and train local workers. 24/7 technical support standby.
*We have offices and agents in some countries and are ready to provide you with solutions.
Maintenance and Support:
*12 months manufacturing warranty on all new installed component parts.
*12 months warranty on engine.
*12 months warranty on hull and all fabricated parts.
*In the event that our customers dredging experience unskilled or mechanical failure or they just need to shoot a minor problem, HICL engineers are available at customer's services, all dredger from HICL, there are always engineers for installation and training if customers needs. Before dredger ex-factory, it will be tested at our launching site for performance and safety like in the work place.
Training:
*E-TOUCH Services offers training and expertise that can help you make sure all of you personnel are operating as safely as possible.
*The products below will help you teach people at every level of your operation how to operate safely and how to communicate clearly, effectively and openly about any potential safety concerns.
*As technology continues to enhance our world, HICL is constantly developing and refining advanced technologies. These products, along with the extensive training curriculum offered, provide everything you need to maximize the performance of your equipment, reduce costly downtime, increase your return on investment, improve safety in your workplace, enhance operator performance, and much more.
Packaging & Shipping
FAQ
Dredger and Ship Building
1, Material Purchase
*Checking the Business License and Registration Certificate of Suppliers.
*Using calipers to test the thickness of steel plate.
*Using sclerometer to test the hardness of the steel plate.
2, Pontoons Welding
*Using welding failure detector to inspect the welding quality.
3, Equipment Assembling
*All the equipments on the dredger should be well-know brand including Cummins engine, Siemens PLC, Japan Yuken Hydraulic valve block.
*Using three dial gauges to adjust the concentricity of engine, gearbox and pump.
*All the electric lines are concealed wiring type.
*All the Hydraulic pipes are pickled three times.
4, Dredger Painting
*All E-TOUCH Dredger construction parts are of shot blasted plate with shop primer. Dredger after construction and assembly all rusty surfaces, welding spots and damaged shop primer will be cleaned and coated with primer.
*The painting of machine parts, readily supplied by third parties will be cleaned and touched -up in the original color.
*Color scheme according to owner's specification.
5, No-load Test
* All the main equipment, including Engine, Gearbox, Pump, Hydraulic system.
* Electric system, are tested for at least 2 hours in factory.
*All the suppliers of the main parts should be on the spot to solve any problem.
6, Dismounting and Packing
*All the parts are marked before dismounting.
*All the small parts are put into packaging box with a packing list.
* All the hydraulic pumps and pipes joints are packed by plastic wrap.
*Every part ( no matter how small ) is registered on the packing list.
7, Delivery
* All the big parts are fixed in the containers by wires ,
* Before delivery, all the persons in charge should sign and make sure all the equipment are in good shape.
Dredger Launching Site is Available in our Shipyard
In order to guarantee good performance and safety of our cutter suction dredger, all our products will be tested at the launching site before ex-factory, it is tested like the machine working in the customer's working site. Performance and safety will be tested and recorded in the testing process. Usually, the buyer can also supervised the testing process before dismantle the dredge.
A. Preparing work before Dredger Testing
1) Customers will be invited to watch dredger test , radio and pictures will email to buyers.
2) Every parts and connections of dredger should be checked strictly before test.
3) Oil and cooling water should be ready for dredger test.
B. Dredger Test Contents
1). Work condition of electricity connection of dredger should be checked .
2). Emergency pump to check operation conditions of hydraulic controlling system,
3). The speed and power of diesel engine should be tested
4). Dredging pump will be tested and rotates at different speed with fresh water. 5). In order to check the operation of various hydraulic machinery and values, the main hydraulic pump will be opened and hydraulic system load performance should be tested.
C. After Testing
1). All equipment performances and testing recorded will be printed as report for customers' reference.
2). after testing, all work about dredger dismantle should be prepared and let customer knows when and what time will do the delivery.